Project A: Aldine Westfield Rd. from BW 8 to Jensen Dr.

Location: From BW 8 to Jensen Dr.

Description: Widen consistently to four lanes

Project Type: City

Funding/Stage: Environmental Assessment

MPOID: MPOID 18040

Project B: SH 249 from BW 8 to I-45

Location: SH 249 from B8 to I-45

Description: Widen to 8 Lanes

Project Type: TxDOT

Funding/Stage: Right of Way

CSJ or MPIOD: CSJ 0720-03-150/MPOID 18999

Project C: FM 1488 Magnolia Relief Route

Location: FM 1488

Description: Construct four lane new roadway from Business FM 1488 to SH 249; Let date: 2029; Cost: $58,865,355

Project Type: Montgomery County

Funding/Stage: Unfunded

MPOID: MPOID 985

Project D: SH 249/B8 Interchange Improvements

Location: SH 249 at BW 8

Description: Exact Improvements TBD

Project Type: HCTRA

Funding/Stage: Unknown

CSJ or MPOID: N/A

Project E: Hardy Downtown Connector

Location: Hardy Toll Road & I-610

Description: Extension of Hardy Toll Road into Downtown Houston

Project Type: HCTRA

Funding/Stage: In Final Design

CSJ or MPOID: CSJ 0912-72-608 / MPOID 15208

Project F: Barker Cypress and SH 290 Interchange

Location:Barker Cypress and US 290

Description: Widening Barker Cypress north and south of SH 290; intersection improvements at Queenston; drainage improvements; construct sidewalks

Project Type: Harris County Precinct 3 & TxDOT

Funding/Stage: Unknown

CSJ or MPOID: N/A

Project G: Hardy Toll Road/ BW 8 Interchange

Location: Hardy Toll Road/ BW 8 Interchange

Description: Traffic and interchange improvements;
Complete remaining Direct Connectors

Project Type: HCTRA

Funding/Stage: In H-GAC TIP

CSJ or MPOID: CSJ 0912-72-609/MPOID 16076

Project H: IAH Entrance Improvements

Location: IAH Entrance at Will Clayton Parkway & US 59/I 69

Description: Safety & Flood Mitigation Improvements

Project Type: City of Houston/Houston Airports

Funding/Stage: N/A

CSJ or MPOID: N/A

Project I: SH 99 Direct Connectors

Location: SH 99 Direct Connectors at IH 45, SH 249, and I 69

Description: Construct Remaining Direct Connectors

Project Type: TxDOT

Funding/Stage: Environmental Assessment

CSJ or MPOID: SH 249 DCs CSJ 3510-06-021/MPOID 15590 • I-45N DCs CSJ 3510-06-022/MPOID 15591 • IH 69N DCs Segment G CSJ 3510-07-006/MPOID 17232 • IH 69N DCs Segment H CSJ 3510-07-013 MPOID 15592

Project J: FM 1097 Improvements

Location: FM 1097 from SH 75 to east of Union Pacific Railroad

Description: Roadway widening; realignment of intersection; provide new RR grade separation

Project Type: TxDOT

Funding/Stage: Unknown

CSJ or MPOID: N/A

Project K: David Memorial Dr.

Location: David Memorial Dr. Extension north to SH 242

Description: Complete roadway extension

Project Type: 2025 Montgomery County Road Bond

Funding/Stage: Environmental Assessment

MPOID: MPOID 18075

Project O: Old Conroe Rd. Extension

Location:  Loop 336 to FM 1488, over the West Fork San Jacinto River. 

Description: Old Conroe Rd. connection between Loop 336 to FM 1488, over the West Fork San Jacinto River. 

Project Type: City of Conroe

Funding/Stage: In 2025-28 TIP

CSJ or MPOID: N/A

Project M: Lake Houston Parkway

Location: Lake Houston Parkway between BW 8 and Deussen Parkway

Description: Widen from 4 lanes to 6 lanes

Project Type: Harris County Precinct 1

Funding/Stage: In Harris County Major Thoroughfare Plan

CSJ or MPOID: N/A

Project N: Loop 336 Widening

Location: Loop 336 – Conroe

Description: Widen consistently to four lanes

Project Type: TxDOT

Funding/Stage: Environmental Assessment

CSJ or MPOID: Multiple

Project O: Barrier Free Distributor Connectors

Location: Along Entire Tollway

Description: New ramps, ongoing as part of Barrier Free program

Project Type: HCTRA

Funding/Stage: Unfunded

CSJ or MPOID: N/A

Project P: Tollway 249 Widening

Location: SH 249

Description: Expand to 6 lanes, to be consistent with southern portion

Project Type: Montgomery County Toll Road Authority

Funding/Stage: Environmental Assessment

CSJ or MPOID: CSJ 0720-02-099/MPOID 16349

Project Q: FM 1314

Location: SH 105 to SH 242

Description: Reconstruct and widen from 2 lanes to 4 lanes divided

Project Type: TxDOT

Funding/Stage: Unfunded

MPOID: MPOID 981

Project R: NHHIP & IH 45 N PEL

Location: I-45 Downtown to Loop 336 in Conroe

Description: Highway & Transit Improvements from downtown Houston to Conroe

Project Type: TxDOT

Funding/Stage: In H-GAC TIP

CSJ or MPOID: Multiple

Project S: Boudreaux Rd.

Location:Telge Road to 249

Description: Widen 2 lanes to 4 lanes

Project Type: Harris County Precicnt 4

Funding/Stage: Unknown

CSJ or MPOID: N/A

Project T: US 290

Location: Washington County Line to FM 2920

Description: Reconstruct and widen from 4 lanes to 6 lanes; reconstruct grade separations at multiple intersections; install new shared-use paths

Project Type: TxDOT

Funding/Stage: Environmental Assessment

CSJ or MPOID: CSJ 0114-11-077 & 0114-11-083/MOPID 17233-34

Project U: I-45 Frontage Rd. Creation

Location: I-45 at FM 830

Description: Construct frontage road; add right-turn lane; improve signalization

Project Type: Undetermined

Funding/Stage: Unfunded

CSJ or MPOID: See TIP 2025-2028 Transportation Improvement Program

Project V: Old Houston Road Widening

Location: Old Houston Rd. from FM 1314 to Porter Ln.

Description: Widen from 2 lanes to 4 lanes

Project Type: Montgomery County Precinct 4

Funding/Stage: Unfunded